Skip to content

Conversation

openshift-bot
Copy link
Contributor

@openshift-bot openshift-bot commented Sep 29, 2025

Updating ose-machine-api-operator-container image to be consistent with ART for 4.21
TLDR:
Product builds by ART can be configured for different base and builder images than corresponding CI
builds. This automated PR requests a change to CI configuration to align with ART's configuration;
please take steps to merge it quickly or contact ART to coordinate changes.

The configuration in the following ART component metadata is driving this alignment request:
ose-machine-api-operator.yml.

Detail:

This repository is out of sync with the downstream product builds for this component. The CI
configuration for at least one image differs from ART's expected product configuration. This should
be addressed to ensure that the component's CI testing accurate reflects what customers will
experience.

Most of these PRs are opened as an ART-driven proposal to migrate base image or builder(s) to a
different version, usually prior to GA. The intent is to effect changes in both configurations
simultaneously without breaking either CI or ART builds, so usually ART builds are configured to
consider CI as canonical and attempt to match CI config until the PR merges to align both. ART may
also configure changes in GA releases with CI remaining canonical for a brief grace period to enable
CI to succeed and the alignment PR to merge. In either case, ART configuration will be made
canonical at some point (typically at branch-cut before GA or release dev-cut after GA), so it is
important to align CI configuration as soon as possible.

PRs are also triggered when CI configuration changes without ART coordination, for instance to
change the number of builder images or to use a different golang version. These changes should be
coordinated with ART; whether ART configuration is canonical or not, preferably it would be updated
first to enable the changes to occur simultaneously in both CI and ART at the same time. This also
gives ART a chance to validate the intended changes first. For instance, ART compiles most
components with the Golang version being used by the control plane for a given OpenShift release.
Exceptions to this convention (i.e. you believe your component must be compiled with a Golang
version independent from the control plane) must be granted by the OpenShift staff engineers and
communicated to the ART team.

Roles & Responsibilities:

  • Component owners are responsible for ensuring these alignment PRs merge with passing
    tests OR that necessary metadata changes are reported to the ART team: @release-artists
    in #forum-ocp-art on Slack. If necessary, the changes required by this pull request can be
    introduced with a separate PR opened by the component team. Once the repository is aligned,
    this PR will be closed automatically.
  • In particular, it could be that a job like verify-deps is complaining. In that case, please open
    a new PR with the dependency issues addressed (and base images bumped). ART-9595 for reference.
  • Patch-manager or those with sufficient privileges within this repository may add
    any required labels to ensure the PR merges once tests are passing. In cases where ART config is
    canonical, downstream builds are already being built with these changes, and merging this PR
    only improves the fidelity of our CI. In cases where ART config is not canonical, this provides
    a grace period for the component team to align their CI with ART's configuration before it becomes
    canonical in product builds.

ART has been configured to reconcile your CI build root image (see https://docs.ci.openshift.org/docs/architecture/ci-operator/#build-root-image).
In order for your upstream .ci-operator.yaml configuration to be honored, you must set the following in your openshift/release ci-operator configuration file:

build_root:
  from_repository: true

Change behavior of future PRs:

  • In case you just want to follow the base images that ART suggests, you can configure additional labels to be
    set up automatically. This means that such a PR would merge without human intervention (and awareness!) in the future.
    To do so, open a PR to set the auto_label attribute in the image configuration. Example
  • You can set a commit prefix, like UPSTREAM: <carry>: . An example.

If you have any questions about this pull request, please reach out to @release-artists in the #forum-ocp-art coreos slack channel.

@openshift-bot
Copy link
Contributor Author

@openshift-bot openshift-bot added jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. verified Signifies that the PR passed pre-merge verification criteria labels Sep 29, 2025
@openshift-bot openshift-bot changed the title Updating ose-machine-api-operator-container image to be consistent with ART for 4.21 OCPBUGS-62333: Updating ose-machine-api-operator-container image to be consistent with ART for 4.21 Sep 29, 2025
@openshift-ci-robot openshift-ci-robot added the jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. label Sep 29, 2025
@openshift-ci-robot
Copy link
Contributor

@openshift-bot: This pull request references Jira Issue OCPBUGS-62333, which is valid. The bug has been moved to the POST state.

3 validation(s) were run on this bug
  • bug is open, matching expected state (open)
  • bug target version (4.21.0) matches configured target version for branch (4.21.0)
  • bug is in the state New, which is one of the valid states (NEW, ASSIGNED, POST)

Requesting review from QA contact:
/cc @sunzhaohua2

The bug has been updated to refer to the pull request using the external bug tracker.

In response to this:

Updating ose-machine-api-operator-container image to be consistent with ART for 4.21
TLDR:
Product builds by ART can be configured for different base and builder images than corresponding CI
builds. This automated PR requests a change to CI configuration to align with ART's configuration;
please take steps to merge it quickly or contact ART to coordinate changes.

The configuration in the following ART component metadata is driving this alignment request:
ose-machine-api-operator.yml.

Detail:

This repository is out of sync with the downstream product builds for this component. The CI
configuration for at least one image differs from ART's expected product configuration. This should
be addressed to ensure that the component's CI testing accurate reflects what customers will
experience.

Most of these PRs are opened as an ART-driven proposal to migrate base image or builder(s) to a
different version, usually prior to GA. The intent is to effect changes in both configurations
simultaneously without breaking either CI or ART builds, so usually ART builds are configured to
consider CI as canonical and attempt to match CI config until the PR merges to align both. ART may
also configure changes in GA releases with CI remaining canonical for a brief grace period to enable
CI to succeed and the alignment PR to merge. In either case, ART configuration will be made
canonical at some point (typically at branch-cut before GA or release dev-cut after GA), so it is
important to align CI configuration as soon as possible.

PRs are also triggered when CI configuration changes without ART coordination, for instance to
change the number of builder images or to use a different golang version. These changes should be
coordinated with ART; whether ART configuration is canonical or not, preferably it would be updated
first to enable the changes to occur simultaneously in both CI and ART at the same time. This also
gives ART a chance to validate the intended changes first. For instance, ART compiles most
components with the Golang version being used by the control plane for a given OpenShift release.
Exceptions to this convention (i.e. you believe your component must be compiled with a Golang
version independent from the control plane) must be granted by the OpenShift staff engineers and
communicated to the ART team.

Roles & Responsibilities:

  • Component owners are responsible for ensuring these alignment PRs merge with passing
    tests OR that necessary metadata changes are reported to the ART team: @release-artists
    in #forum-ocp-art on Slack. If necessary, the changes required by this pull request can be
    introduced with a separate PR opened by the component team. Once the repository is aligned,
    this PR will be closed automatically.
  • In particular, it could be that a job like verify-deps is complaining. In that case, please open
    a new PR with the dependency issues addressed (and base images bumped). ART-9595 for reference.
  • Patch-manager or those with sufficient privileges within this repository may add
    any required labels to ensure the PR merges once tests are passing. In cases where ART config is
    canonical, downstream builds are already being built with these changes, and merging this PR
    only improves the fidelity of our CI. In cases where ART config is not canonical, this provides
    a grace period for the component team to align their CI with ART's configuration before it becomes
    canonical in product builds.

ART has been configured to reconcile your CI build root image (see https://docs.ci.openshift.org/docs/architecture/ci-operator/#build-root-image).
In order for your upstream .ci-operator.yaml configuration to be honored, you must set the following in your openshift/release ci-operator configuration file:

build_root:
 from_repository: true

Change behavior of future PRs:

  • In case you just want to follow the base images that ART suggests, you can configure additional labels to be
    set up automatically. This means that such a PR would merge without human intervention (and awareness!) in the future.
    To do so, open a PR to set the auto_label attribute in the image configuration. Example
  • You can set a commit prefix, like UPSTREAM: <carry>: . An example.

If you have any questions about this pull request, please reach out to @release-artists in the #forum-ocp-art coreos slack channel.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

Copy link
Contributor

openshift-ci bot commented Sep 29, 2025

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by:
Once this PR has been reviewed and has the lgtm label, please assign radekmanak for approval. For more information see the Code Review Process.

The full list of commands accepted by this bot can be found here.

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

Copy link
Contributor

@chrischdi chrischdi left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

/lgtm

@openshift-ci openshift-ci bot added the lgtm Indicates that a PR is ready to be merged. label Sep 30, 2025
@openshift-ci-robot
Copy link
Contributor

openshift-ci-robot commented Oct 1, 2025

@openshift-bot: This pull request references Jira Issue OCPBUGS-62333, which is valid.

3 validation(s) were run on this bug
  • bug is open, matching expected state (open)
  • bug target version (4.21.0) matches configured target version for branch (4.21.0)
  • bug is in the state POST, which is one of the valid states (NEW, ASSIGNED, POST)

Requesting review from QA contact:
/cc @sunzhaohua2

In response to this:

Updating ose-machine-api-operator-container image to be consistent with ART for 4.21
TLDR:
Product builds by ART can be configured for different base and builder images than corresponding CI
builds. This automated PR requests a change to CI configuration to align with ART's configuration;
please take steps to merge it quickly or contact ART to coordinate changes.

The configuration in the following ART component metadata is driving this alignment request:
ose-machine-api-operator.yml.

Detail:

This repository is out of sync with the downstream product builds for this component. The CI
configuration for at least one image differs from ART's expected product configuration. This should
be addressed to ensure that the component's CI testing accurate reflects what customers will
experience.

Most of these PRs are opened as an ART-driven proposal to migrate base image or builder(s) to a
different version, usually prior to GA. The intent is to effect changes in both configurations
simultaneously without breaking either CI or ART builds, so usually ART builds are configured to
consider CI as canonical and attempt to match CI config until the PR merges to align both. ART may
also configure changes in GA releases with CI remaining canonical for a brief grace period to enable
CI to succeed and the alignment PR to merge. In either case, ART configuration will be made
canonical at some point (typically at branch-cut before GA or release dev-cut after GA), so it is
important to align CI configuration as soon as possible.

PRs are also triggered when CI configuration changes without ART coordination, for instance to
change the number of builder images or to use a different golang version. These changes should be
coordinated with ART; whether ART configuration is canonical or not, preferably it would be updated
first to enable the changes to occur simultaneously in both CI and ART at the same time. This also
gives ART a chance to validate the intended changes first. For instance, ART compiles most
components with the Golang version being used by the control plane for a given OpenShift release.
Exceptions to this convention (i.e. you believe your component must be compiled with a Golang
version independent from the control plane) must be granted by the OpenShift staff engineers and
communicated to the ART team.

Roles & Responsibilities:

  • Component owners are responsible for ensuring these alignment PRs merge with passing
    tests OR that necessary metadata changes are reported to the ART team: @release-artists
    in #forum-ocp-art on Slack. If necessary, the changes required by this pull request can be
    introduced with a separate PR opened by the component team. Once the repository is aligned,
    this PR will be closed automatically.
  • In particular, it could be that a job like verify-deps is complaining. In that case, please open
    a new PR with the dependency issues addressed (and base images bumped). ART-9595 for reference.
  • Patch-manager or those with sufficient privileges within this repository may add
    any required labels to ensure the PR merges once tests are passing. In cases where ART config is
    canonical, downstream builds are already being built with these changes, and merging this PR
    only improves the fidelity of our CI. In cases where ART config is not canonical, this provides
    a grace period for the component team to align their CI with ART's configuration before it becomes
    canonical in product builds.

ART has been configured to reconcile your CI build root image (see https://docs.ci.openshift.org/docs/architecture/ci-operator/#build-root-image).
In order for your upstream .ci-operator.yaml configuration to be honored, you must set the following in your openshift/release ci-operator configuration file:

build_root:
 from_repository: true

Change behavior of future PRs:

  • In case you just want to follow the base images that ART suggests, you can configure additional labels to be
    set up automatically. This means that such a PR would merge without human intervention (and awareness!) in the future.
    To do so, open a PR to set the auto_label attribute in the image configuration. Example
  • You can set a commit prefix, like UPSTREAM: <carry>: . An example.

If you have any questions about this pull request, please reach out to @release-artists in the #forum-ocp-art coreos slack channel.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@chrischdi
Copy link
Contributor

/retest-required

1 similar comment
@chrischdi
Copy link
Contributor

/retest-required

Copy link
Contributor

openshift-ci bot commented Oct 1, 2025

@openshift-bot: The following tests failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
ci/prow/e2e-vsphere-ovn-techpreview-serial 78f2c48 link false /test e2e-vsphere-ovn-techpreview-serial
ci/prow/e2e-vsphere-ovn-serial 78f2c48 link false /test e2e-vsphere-ovn-serial
ci/prow/e2e-nutanix 78f2c48 link false /test e2e-nutanix
ci/prow/e2e-openstack 78f2c48 link false /test e2e-openstack
ci/prow/e2e-vsphere-host-groups-ovn-techpreview 78f2c48 link false /test e2e-vsphere-host-groups-ovn-techpreview
ci/prow/e2e-metal-ipi-ovn-dualstack 78f2c48 link false /test e2e-metal-ipi-ovn-dualstack
ci/prow/okd-scos-e2e-aws-ovn 78f2c48 link false /test okd-scos-e2e-aws-ovn
ci/prow/e2e-aws-operator-techpreview 78f2c48 link false /test e2e-aws-operator-techpreview
ci/prow/e2e-aws-ovn-upgrade 78f2c48 link true /test e2e-aws-ovn-upgrade
ci/prow/e2e-aws-operator 78f2c48 link true /test e2e-aws-operator
ci/prow/e2e-aws-ovn 78f2c48 link true /test e2e-aws-ovn

Full PR test history. Your PR dashboard.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. verified Signifies that the PR passed pre-merge verification criteria
Projects
None yet
Development

Successfully merging this pull request may close these issues.

3 participants